Things are steaming ahead onsite with impressive progress made over the past two weeks. Each apartment is starting to take shape with the steel stud partitions going up, you really get a sense of the spaces to come and I have to say… the spaces feel great!


This is what Black Interiors have and will be working on over the next few weeks;


WORK IN PROGRESS AND COMPLETED OVER THE PAST WEEK


-Frame steel stud partitions L1 ongoing

- Setout and begin framing L2

- Start first fix of sprinklers L2

-Concrete scanning for services

- Set out core holes for drainage ongoing

-Demo of remaining internal kitchens and windows


CURRENT WORK PROGRAMMED


-Material load ins, on going

-Frame steel stud partitions L1 ongoing

- Framing L2 steel stud partitions ongoing

- First fix of sprinklers L3 ongoing

- Set out core holes for drainage

- Core drilling level 2

-Isolation and removal of electrical and fire services in Ground floor tenancies

-Demolition of partitions in ground floor tenancies

-Set out of plumbing

-Slab scanning

-Plasterboard linings L1


HOW IT’S LOOKING (these photos were taken at night so look a bit dark)


LEVEL 1

LEVEL 2

LEVEL 3


This photo was taken last month but look at that light and sun!

Looking forward to watching this development take form… there are so many beautiful design elements to look forward to.